JP Foods
Glasgow

Introduction

JP Foods made contact with us, the aim was to reduce their energy costs and become almost self sufficient, as their electricity demand is very high. We start the process with designing a bespoke system tailored to the customer. We then make contact with SPEN to apply for a grid connection, and submit the G99 application.

Environmental Impact

05 Green Energy

Saving the Grid

Utilizing the sun to be taking minimal power from the grid

15 Solar Cell

Power

Producing so much power we can put back in to the grid.

20 Save Ecology

Eco-Friendly

More environmentally friendly way of running a business.

Est 2015

Approval

We recieve an offer from SPEN to install 250Kw of solar, We arrange a final site visit before starting the install to ensure minimal disruption to the day to day running of the wholesalers.

Installation

We agree a date for installation with JP and commence the work which will take 1 week to complete weather permitting

Handover

The system is installed and commissioned successfully, we handover the system and all documents to JP Foods, the ROI on this system will be between 2-3 years